摘要
简要介绍了文博大厦工程概况以及对空调方案的比选,并对文博大厦采用可变冷媒流量空调系统进行了介绍。结合本工程实际,对以后变冷媒流量空调系统设计应注意的问题提出了建议和看法。
It introduces the general situation of the high-rise called WenBo simply, compare the project of air-condition, and introduces something about air-condition adopting the system of chilling runoffofintermediary .According to the fact in the project ,I put forward my opinions and some suggestions to the problems which should be given attention to in the same design in the future.
出处
《工程建设与设计》
2007年第1期31-33,共3页
Construction & Design for Engineering
关键词
变冷媒流量
空调
设计
the runoff of intermediary when chilling air-condition
design