期刊文献+

Soft Computing Based Procurement Planning of Time-variable Demand in Manufacturing Systems 被引量:1

Soft Computing Based Procurement Planning of Time-variable Demand in Manufacturing Systems
下载PDF
导出
摘要 Procurement planning with discrete time varying demand is an important problem in Enterprise Resource Planning (ERP). It can be described using the non-analytic mathematical programming model proposed in this paper. To solve the model we propose to use a fuzzy decision embedded genetic algorithm. The algorithm adopts an order strategy selection to simplify the original real optimization problem into binary ones. Then, a fuzzy decision quantification method is used to quantify experience from planning experts. Thus, decision rules can easily be embedded in the computation of genetic operations. This approach is applied to purchase planning problem in a practical machine tool works, where satisfactory results have been achieved. Procurement planning with discrete time varying demand is an important problem in Enterprise Resource Planning (ERP). It can be described using the non-analytic mathematical programming model proposed in this paper. To solve the model we propose to use a fuzzy decision embedded genetic algorithm. The algorithm adopts an order strategy selection to simplify the original real optimization problem into binary ones. Then, a fuzzy decision quantification method is used to quantify experience from planning experts. Thus, decision rules can easily be embedded in the computation of genetic operations. This approach is applied to purchase planning problem in a practical machine tool works, where satisfactory results have been achieved.
出处 《International Journal of Automation and computing》 EI 2007年第1期80-87,共8页 国际自动化与计算杂志(英文版)
基金 This work was supported by Hong Kong Polytechnic University(No.G.45.37.T363), the National Natural Science Foundation of PRC(No.70431003,60521003).
关键词 Purchase planning Enterprise Resource Planning (ERP) soft computing genetic algorithm fuzzy decision inventory control. Purchase planning, Enterprise Resource Planning (ERP), soft computing, genetic algorithm, fuzzy decision, inventory control.
  • 相关文献

参考文献12

  • 1Y. Yi,D. W. Wang.Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines[J].Journal of Intelligent Manufacturing (-).2003(3-4)
  • 2汪定伟,容启亮,叶伟雄.Partner selection model and soft computing approach for dynamic alliance of enterprises[J].Science in China(Series F),2002,45(1):68-80. 被引量:5
  • 3J.T.Teng,,H.J.Chang,C.Y.Dye,C.H.Hung.An Optimal Replenishment Policy for Deteriorating Items with Timevarying Demand and Partial Backlogging[].Operations Research.2002
  • 4D.Wang,,K.L.Yung,W.H.Ip.A Heuristic Genetic Algorithm for Subcontractor Selection in a Global Manufacturing Environment[].IEEE Transactions on SystemsManand Cybernetics—Part C.2001
  • 5M.O.Abuo-El-Ata,,H.A.Fergany,M.F.El-Wakeel.Probabilistic Multi-item Inventory Model with Varying Order Cost under Two Restrictions:A Geometric Programming Approach[].International Journal of Production Economics.2003
  • 6Z.T.Balkhi,,L.Benkhrouf.On the Optimal Replenishment Schedule for an Inventory System with Deteriorating Items and Time-varying Demand and Production Rates[].Computers and Industrial Engineering.1996
  • 7L.C.Jain.Fuzzy Logic in Engineering,Soft Computing Techniquss in Knowledge-Based Intelligent Engineering Systems[]..1997
  • 8J.R.R.Jang,,C.T.Sun,E.Mizutani.Nenro-Fazzy and Soft Computing[]..1997
  • 9Y.W.Zhou.A Multi-warehouse Inventory Model for Items with Time-varying Demand and Shortages[].Computers and Operations Research.2003
  • 10R.P.Sundarraj,,S.Talluri.A Multi-period Optimization Model for the Procurement of Component-based Enterprise Information Technologies[].European Journal of Operational Research.2003

二级参考文献14

  • 1[1]Hellard, R. B., Project Partnering Principle and Practice, London: Thomas Telford Publications, 1995.
  • 2[2]Goldman, S., Nagel, R., Preiss, K., Agile Competitors and Virtual Organizations, New York: Van Nostrand Reinhold, 1995.
  • 3[3]Maloni, M. J., Benton, W. C., Supply chain partnerships: Opportunities for operations research, Eur. J. Operational Research, 1997, 101(3): 419-429.
  • 4[4]Davis, M., O'Sullivan, D., Systems design framework for the extended enterprise, Production Planning and Control, 1999, 10(1): 3-18.
  • 5[5]Talluri, S., Baker, R. C., Quantitative framework for designing efficient business process alliances, Managing Virtual Enterprises: A Convergence of Communications, Computing, and Energy Technologies, IEEE International Engineering Management Conference 1996, Piscataway, NJ: IEEE Press, 1996, 656-661.
  • 6[6]Elmaghraby, S. E., Activity Networks_Project Planning and Control by Network Models, New York: John Wiley and Sons, 1997.
  • 7[7]Brucker, P., Drexl, A., Mohring, R. et al., Resource_constrained project scheduling: Notation, classification, models, and methods, Eur. J. Operational Research, 1999, 112(1): 3-41.
  • 8[8]Zadeh, L. A., Fuzzy logic, neural networks and soft computing, Communications of the ACM, 1994, 37(3): 77-84.
  • 9[9]Medsker, L. R., Hybrid Intelligent Systems, Boston: Kluwer Academic Publishers, 1995.
  • 10[10]Gen, M., Cheng, R., Genetic Algorithms and Engineering Design, New York: John Wiley & Sons, 1996.

共引文献4

同被引文献40

  • 1郭耀煌,李军.车辆优化调度问题的研究现状评述[J].西南交通大学学报,1995,30(4):376-382. 被引量:51
  • 2蒋忠中,汪定伟.物流配送车辆路径优化的模糊规划模型与算法[J].系统仿真学报,2006,18(11):3301-3304. 被引量:33
  • 3王晓博,李一军.电子商务中物流配送路径优化研究[J].计算机工程,2007,33(10):202-204. 被引量:14
  • 4张瑞锋.基于混合算法的带时间窗的车辆路径问题求解[J].计算机工程,2007,33(14):185-187. 被引量:8
  • 5Kohl N, Madsen O B G. An optimization algorithm for the vehicle routing problem with time windows based on lagrangian relaxation [ J ]. Operations Research, 1997,45 (3) :395 -406.
  • 6Gillett B E, Miller L R. A heuristic algorithm for the vehicle - dispatch problem [ J ]. Operations Research, 1974, 22(2) :240 -349.
  • 7Clarke G, Wright J W. Scheduling of vehicles from a central depot to a number of delivery points [ J ]. Operations Research, 1964, 12(4):568-581.
  • 8David Pisinger, Stefan Ropke. A general heuristic for vehicle routing problems [ J ]. Computers & Operations Research, 2007 (34) :2403 - 2435.
  • 9VAIDYANATHAN, Matson, BHARATH S, et al. A capacitated vehicle routing problem for just - in - time delivery [ J ]. IIE Transactions, 1999 ( 31 ) : 1083 - 1092.
  • 10Gabor Nagy, Said Salhi. Heuristic algorithms for single and multiple depot vehicle routing problems with pickups and deliveries [ J ]. European Journal of Operational Research, 2005 (162) : 126 - 141.

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部