期刊文献+

淮北市水资源管理及超采漏斗控制对策

Solution to water resource management and drawdown funnel control in Huaibei City
下载PDF
导出
摘要 以淮北市为例,综合考虑该地区水资源开发利用现状、未来开采情况及地下水超采漏斗恢复等问题,针对不同水文年份,拟定了12个水资源管理方案,并分别建立淮北市水资源规划管理模型.通过对模型计算结果的分析和对比,认为未经优化的现状开采方案是不合理的,需要对开采布局进行调整.同时,随着未来几年水资源需求量的不断增加,提出了新增水源地的梯级开发方案和过程,从而保证了目前、2010和2030年需水状况下,超采漏斗分别为保持现状、恢复25%和50%的环境、水资源总量及需求量等,提高地下水与地表水的综合利用效率,治理和恢复超采漏斗,使经济效益和环境效益最佳. The twelve projects of water resource management in Huaibei city offer a to water resource exploitation and application now and future in this area, as well year. Models of water resource management are put forward based on these proje comprehensive consideration as in different hydrological cts..Through analyzing and comparing the calculation results of models, it is concluded that the project of water resource exploitation not optimized now is unreasonable, so the distribution of water application should be adjusted. With the increasing of water demand in the future, a step scheme and process to new fountains are put forward. Accordingly, these restrictions, such as the water resource gross, the water demand and the environment to drawdown funnel in keeping present status, from 25% and 50% respectively in present, 2010 and 2030 year, are improved. The integration efficiency of groundwater and surface water can been exerted and drawdown funnel comeback, to obtain maximam benefit in economy and environment.
作者 朱斌 武强
出处 《桂林工学院学报》 北大核心 2006年第4期476-480,共5页 Journal of Guilin University of Technology
基金 教育部跨世纪优秀人才基金资助项目(2000-16)
关键词 水资源 管理模型 超采漏斗治理 淮北 water resource management model drawdown funnel control Huaibei city
  • 相关文献

参考文献8

  • 1安徽省第一水文地质工程地质队.安徽省淮北北部岩溶区水文地质普查报告[R].蚌埠:安徽省地质局,1990.1-34.
  • 2陈陆望,桂和荣,胡友彪,许光泉,袁文华.皖北矿区煤层底板岩溶水水化学特征研究[J].煤田地质与勘探,2003,31(2):27-30. 被引量:13
  • 3安徽省淮北市水利局.安徽省淮北市城市供水水资源规划[R].合肥:安徽省水利科学研究院,2002:80—87.
  • 4Maddock T III. Algebraic technological function from a simulation model [J]. Water Resour. Res. , 1972, 8 (1) :129 - 134.
  • 5Heidari M. Application of linear systems theory and linear programming to groundwater management in Kansas [ J ].Water Resour. Bull., 1982, 18:1003-1012.
  • 6Wu Qiang, Yin Zhongmin, Wu Xun. Groundwater Study in the Weerselo Area, Overijssel, the Netherlands [ M ].Beijing: Petroleum Industry Press, 2001,47 -74.
  • 7El Magnouni S, Treichel W. A multicriterion approach to groundwater management [J]. Water Resour. Res., 1994,30 (6): 1881-1895.
  • 8朱斌,武强.断层影响下的地下水流数值模拟[J].桂林工学院学报,2005,25(1):31-35. 被引量:7

二级参考文献8

  • 1沈照理 朱宛华 钟左燊.水文地球化学基础[M].北京:地质出版社,1995..
  • 2John Marler,Shemin Ge.The permeability of the Elkhorn fault zone, South Park,Colorado[J].Groundwater,2003,41(3):223-233.
  • 3罗元华 叶贵均 武强.焦作能源工业基地水资源合理开发利用研究[R].北京:中国矿业大学北京校区,1997.114-122.
  • 4安徽省区调队.砀山、宿县、灵璧幅1∶20万区域地质调查报告[R].合肥:安徽省地质局,1977..
  • 5安徽省第一水文地质工程地质队.安徽省淮北北部岩溶区水文地质普查报告[R].蚌埠:安徽省地质局,1990.1-34.
  • 6u Qiang,Yin Zhongmin,Wu Xun.Groundwater study in the Weerselo area,Overijssel,the Netherlands[M].北京:石油工业出版社,2001:47-74.
  • 7Moench A F.Importance of the Vadose zone in analyses of unconfined aquifer tests[J].Groundwater,2004,42(2):223-233.
  • 8张宗枯 沈照理 薛禹群 等.华北平原地下水环境演化[M].北京:地质出版社,2000..

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部