摘要 分析了小湾水电站高边坡的地质结构特征,结合施工进行了爆破试验、爆破振动监测、爆破前后岩体声波波速对比测试和边坡岩体宏观调查。通过对爆破试验的各项测试结果进行分析,对比类似工程的经验,提出了小湾水电站高边坡开挖的爆破安全判据为:微风化岩体的震速为15-20cm/s,弱风化岩体10~15cm/s,强风化岩体10cm/s,以上一个马道坡脚位置作为控制点,并确定了使用原则。其试验成果在施工爆破中得到了验证。 The geological structure character was analyzed about high slope on Xiaowan Hydropower Station. Blasting test in construction field, vibration monitoring, contrast tests of wave velocity before and after blasting, and macro-survey for the Xiaowan Hydropower Station were performed. Compared with similar engineering experiences, the blasting safety controlled standard of wave velocity inside rock for Xiaowan Hydropower Station is as follows: for minutely weathered rock, v = 15 - 20 cm/s; for weakly weathered rock, v = 10 - 15 cm/s; for strong weathered rock, v = 10 cm/s. The test results were verified in construction site and considered to be rational .
出处 《长江科学院院报》 CSCD 北大核心 2007年第1期40-43,共4页 Journal of Changjiang River Scientific Research Institute
关键词 小湾水电站 高陡边坡 爆破安全判据 Xiaowan Hydropower Station high and steep slope judging standard of blasting vibration safety
  • 相关文献

参考文献2

二级参考文献1

  • 1朱传统,刘宏根,梅锦煜.地震波参数沿边坡坡面传播规律公式的选择[J]爆破,1988(02).

共引文献49

同被引文献215

引证文献27

二级引证文献223

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部