摘要
本文利用GISS仿真系统对某电厂350MW火电机组的RUN BACK (RB)工况进行了仿真.着重对RB后采用定压运行和滑压运行两种不同的方式进行试验,结果表明,RB后采用滑压运行方式更加合理.该仿真试验对实际机组控制策略的改造提供了有益的参考。
This paper simulate the RB condition of the 350MW power plant based on GISS simulation support system , and we take more care of the difference between the constant pressure mode and the variable pressure mode after the runback .The simulated result show that the variable pressure mode is more reasonable .It can do some help for us in the control design in the real power plant.
出处
《仪器仪表用户》
2007年第1期6-7,共2页
Instrumentation
关键词
RB
仿真机
定压运行
滑压运行
runback
simulator
constant pressure mode
variable pressure mode