介绍了高坝洲导流明渠在开挖工作中由于水文、地质等条件的变化而遇到的困难及处理措施。
The difficulties in excavation works of the diversion channel of Gaobazhou hydroproject caused by the change of hydrological and geological conditions and the overcoming measures for them are described.
出处
《湖北水力发电》
2007年第1期39-42,共4页
Hubei Water Power
关键词
高坝洲水利枢纽
开挖
导流明渠
Gaobazhou Hydroproject
excavation
diversion channel