摘要
介绍了高坝洲电厂从减少弃水增加运行调度灵活性出发,挖掘机组潜能,扩大机组容量。对此方案的可行性进行了技术论证和试验。
The feasibility of capacity expansion plan of the hydrogenerating sets of Gaobazhou hydropower plant is studied on the basis of tapping latent power, reducing surplus water and enhancing operational flexibility of them, in addition, a technical test is made to prove the feasibility of this plan.
出处
《湖北水力发电》
2007年第1期51-53,共3页
Hubei Water Power
关键词
水能
发电机
水轮机
增容
研究
water power
generator
turbine
capacity expansion
study