小樊一级站水泵出水量减少原因及改进方案分析 被引量:1

Causation of Outflow Decrease from No. 1 Pumping Station of Xiaoman Project and the Improvement Scheme
下载PDF
导出
摘要 本文通过分析和计算得出,(1)水泵出水量减小的主原因是水泵随机资料有误;(2)提高泵站前池水位,增设32SA-19C型水泵是解决供水矛盾的有效措施;(3)加大24SA-18型水泵叶轮,可提高泵站运行的适应性与灵活性。 According to theoretical analysis and calculation, it was point out that the causation of outflow decrease was due to the incorrect data used for design the pump and resulted in pump blade cutting irrational. The countermeasures were to increase the water level in forebay and to augment a 32SA-19C type pump. Augmentation the blade of 24SA-18 pump can improve the performance and made it run with much adaptive and flexible.
作者 杨勇
出处 《西北水力发电》 2006年第5期92-94,96,共4页 Journal of Northwest Hydroelectric Power
基金 运城市临猗县副局长刘观灯先生对本文的撰写提了很多意见和帮助,在此表示感谢.
关键词 小樊一级站 水泵 叶轮切削 出水量 No. 1 pumping station of Xiaoman Project Pump blade cutting outflow