预制节段逐跨拼装施工中的计算机辅助控制

On Computer Sub-control in Prefabricated Segment Span-by-span Installation
下载PDF
导出
摘要 通过对上海市沪闵路高架道路二期工程中预制节段逐跨拼装施工的实践和总结,在介绍预制节段逐跨拼装施工的基础上,叙述了运用荷载转换这一关键工艺进行计算机辅助控制的原理与方法。计算机辅助控制的应用,不仅解决了复杂体系受力计算困难的问题,还提高了施工的安全性,保证施工质量,加快施工进度,效果良好。 Based on the practice and summary of Hu-Min Viaduct (II) construction in Shanghai by erecting prefabricated segments span by span, des-cription is made of the mechanism and way of computer-aided control (CAC) over the load transformation, a key step of workmanship. The application of CAC overcame the difficulty in the complicated calculation of forces on the system, and also got satisfactory results such as higher operation safety, better construction quality, and shorter construction period.
作者 蒋海里
出处 《中国市政工程》 2006年第6期34-36,共3页 China Municipal Engineering
关键词 高槊道路 预制节段 逐跨拼装 荷载转换 计算机辅助控制 elevated line prefabricated segment span-by-span installation load change computer sub-control