期刊文献+

R&D of Complete Equipment for 750-kV Transmission System

R&D of Complete Equipment for 750-kV Transmission System
下载PDF
导出
摘要 The rapid growth of power demand driven by national economic booming has placed challenges before power grids to build transmission lines on higher voltage level over current 500 kV. The construction of 750-kV demonstrative transmission project and promotion of present transmission capability are imperative necessities to lay foundations for research and development of 750-kV or even 1000-kV complete equipment. The rapid growth of power demand driven by national economic booming has placed challenges before power grids to build transmission lines on higher voltage level over current 500 kV. The construction of 750-kV demonstrative transmission project and promotion of present transmission capability are imperative necessities to lay foundations for research and development of 750-kV or even 1000-kV complete equipment.
出处 《Electricity》 2006年第4期36-41,共6页 电气(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部