根据张马屯铁矿现有的生产条件及年产50万t原矿生产规模的要求,若采用水力提升矿石替代传统的机械提升,每年可节约提升费用540.8万元,并大大降低矿山的改扩建费用。
According to present production conditions and requirement for production scale of annually producting 0.5 million tons ore,if water-power lifting ore is substituted for machinary,lifting cost of 5.408 million yuan annually can be saved and the rehabilitalion cost of the mine can be greatly decreased.