摘要
嘉兴市平湖塘特大桥为钢管混凝土系杆拱桥,采用先梁后拱的施工方法,施工中,对系梁的应力进行全过程监控,既保证了桥梁的施工质量,又保证了施工安全。
The construction method first beam and then the arch was adopted in this bridge project. And the beam stress was monitored in the whole process of construction which guaranteed the construction quality and safety.
出处
《建筑技术》
北大核心
2007年第2期108-111,共4页
Architecture Technology
关键词
钢管混凝土
系杆拱桥
应力监测
steel pipe concrete
tied-arch bridge
stress monitoring