资源约束下PERT施工进度计划的优化 被引量:4

Time-resources tradeoffs of PERT construction schedule under resource constraints
下载PDF
导出
摘要 针对资源限制下PERT施工进度计划的工期资源优化问题,引进评价风险量的关键指标———活动关键度指标(ACI)和重要度指标(CRI),采用0-1整数规划技术,建立资源配置优化模型以及优化计算方法;运用Delphi7.0和Lindo工具,开发了该方法的应用程序,并结合实例进行了应用。结果表明,考虑进度风险因素的优化模型是科学合理的。 By introduction of two key indexes for risk evaluation, i, e. the activity criticality index (ACI) and cruciality index (CRI) and adoption of 0-1 integer programming algorithm, a resource reallocation model and a calculating method were established for time-resources tradeoffs of PERT resource-constrained scheduling. An application program according to the function of tradeoff algorithm was complied by use of Delphi 7.0 and Lindo software. Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
出处 《水利水电科技进展》 CSCD 北大核心 2007年第1期27-30,共4页 Advances in Science and Technology of Water Resources
关键词 施工进度 PERT 资源约束 工期-资源优化 0-1整数规划 construction schedule PERT resource constraint time-resources tradeoff 0-1 integer programming
  • 相关文献

参考文献6

  • 1蔡晨,万伟.基于PERT/CPM的关键链管理[J].中国管理科学,2003,11(6):35-39. 被引量:105
  • 2CHOI J, REALFF M J, LEE J H. Dynamic programming in a heuristically confined state space: a stochastic resource-constrained project scheduling application [ J ]. Computers and Chemical Engineering, 2004,28 : 1039-1058.
  • 3GOLENKO-GINZBURG D, AHARON G. A heuristic for network project scheduling with random activity durations depending on the resource allocation[J]. Int J Production Economics, 1998,55 : 149-162.
  • 4LASLO Z. Activity time-cost tradeoffs under time and cost chance constraints [ J ]. Computers & Industrial Engineering,2003,44: 365-384.
  • 5胡肇枢,王卓甫.ERT网络计算分析之补充[J].河海大学学报(自然科学版),2002,30(1):29-34. 被引量:6
  • 6王卓甫,杨高升,杨建基,沈祖诒.水利水电施工中应用PERT的完工概率问题[J].河海大学学报(自然科学版),2002,30(1):44-48. 被引量:33

二级参考文献6

共引文献138

同被引文献26

  • 1王淑云,朱祥松,李洁.基于资源约束的扩张关键路径法研究[J].管理工程学报,2006,20(1):109-111. 被引量:11
  • 2刘晓峰,陈通,张连营.基于微粒群算法的工程项目质量、费用和工期综合优化[J].土木工程学报,2006,39(10):122-126. 被引量:40
  • 3Salah E.Elmaghraby.On criticality and sensitivity in activity networks[J].European Journal of Operational Research,2000,127:220-238.
  • 4Goldratt EM. The Goal [M].2nd revised ed.Barrington(MA):The North River Press, 1992.
  • 5Kolisch R, Padman R. An integrated survey of deterministic project scheduling [J ]. The International Journal of Management Science, 2001(29) : 249.
  • 6Bajis Dodin. Determining the K most critical paths in PERT networks[J]. Opns Res, 1984, 32(4):859.
  • 7Keefer D L, Verdini W A, Better estimation of PERT activity time parameters[J].Management Science, 1993, 39(9) :1086.
  • 8Thomas A C, Donald D T. Project risk management using the project risk FMEA [J].Engineering Management Journal, 2004, 16 (4) :28.
  • 9Mohamed K K. Project risk management using monte carlo simulation [ C ]. Morgantown, West Virginia.. AACE International Transactions, AACE International, 2006.
  • 10Jeffry H M, Larry R W. Decision modeling with microsoft excel[M]. 6th ed. New Jersey.. Prentice Hall, 2001.

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部