期刊文献+

哈尔滨第一热电厂取水口模型试验研究 被引量:4

Model tests on water intakes of Haerbin No.1 Thermal Power Plant
下载PDF
导出
摘要 通过河工模型试验,对哈尔滨第一热电厂补给水取水口局部区域的水力、泥沙运动及地形冲淤规律进行了研究,在确保电厂取水能力的前提下预测了可能的冲刷、淤积程度,并在此基础上对取水口的原布置形式进行了优化。试验表明,所设计的优化布置形式能够最大限度地避免取水口的淤积,有利于电厂取水口的安全、可靠运行。 Based on fiver model tests, a study was performed of the local waterpower, sediment transport, and regularity of sediment erosion and siltation at water intakes for water recharge to the thermal power plant. The degree of erosion and siltation that might occur was predicted on the premise to ensure the capacity of water-intaking of the thermal power plant, and the original layout of water intakes was optimized. Tests show that the optimized layout of water intakes can reduce the erosion and siltation to the greatest extent and ensure the safe and reliable operation of water intakes.
出处 《水利水电科技进展》 CSCD 北大核心 2007年第1期53-56,59,共5页 Advances in Science and Technology of Water Resources
关键词 热电厂 取水口 泥沙冲淤 模型试验 thermal power plant water intake sediment erosion and siltation model test
  • 相关文献

参考文献4

二级参考文献6

  • 1李富铜,丘宜平,潘载雄.东江—深圳供水三期扩建工程东江抽水站引水口防淤工程措施研究[J].广东水电科技,1995(4):17-21. 被引量:3
  • 2尹学良 王延贵.关于分流衍积的一些问题[J].水利学报,1988,(3).
  • 3武汉水利电力学院.河流泥沙工程学(下册)[M].北京:水利出版社,1980..
  • 4.四零四厂取水工程改造项目可行性研究[R].甘肃省水电勘测设计院,1999-11..
  • 5.四零四厂取水工程改造项目水工模型试验报告[R].水利部西北水利科学研究所,2005-5..
  • 6宋祖诏.渠首工程[M].北京:水利电力出版社,1981..

共引文献17

同被引文献17

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部