摘要
以沈阳银基地王国际花园二期C座工程为例,介绍了模板支设、钢筋安装及冬期混凝土施工的技术要点,以保证高箱形结构转换层施工模板支撑系统的稳定,冬期施工混凝土的质量,确保了施工安全。
Taking the second phase C building construction in international garden in Shenyang as an example, the author introduces construction dements of formwork erection, steel-bar installation and concrete construction in winter, in order to guarantee the stability of high box structural transfer floor construction formwork supporting system, the quality of concrete construction in winter, and the construction safety.