摘要
详细介绍了华润水泥(贵港)有限公司2×5000t/d水泥生产项目工艺设计方案,主要包括石灰石破碎及输送、原料均化、熟料烧成、水泥粉磨、水泥出厂等;并介绍了各主要车间的主机配置及其技术特点。此外,还就这两条生产线运行过程中出现的一些问题及其解决措施作了简要介绍。
The paper introduced in detail the process design scheme of 2×5 000 t/d clinker production project of china resources Cement (Guigang) Ltd.. The main contents include limestone breaking and conveying, raw material homogenizing, clinker calcining, cement grinding and cement leaving factory, and etc. And introduced the main equipments collocation in every main workshop and the technical characteristics. In addition, introduced in brief the problems emerged in the running process of the two production lines snd as well as the settlements.
出处
《水泥工程》
CAS
2007年第1期7-11,共5页
Cement Engineering
关键词
5000t/d熟料生产线
工艺设计
主机配置
达产达标
5 000 t/d clinker production line
process design
main equipment collocation
reach output and standard