期刊文献+

复杂山地条件、特长、大埋深公路隧道工程地震勘探技术方法 被引量:3

ENGINEERING SEISMIC EXPLORATION TECHNOLOGIES FOR TUNNELS WITH COMPLEX MOUNTAIN CONDITIONS,EXTRAORDINARY LENGTH AND GREAT BURIED DEPTH
下载PDF
导出
摘要 通过对复杂山地条件、特长、大埋深的雪峰山公路隧道的工程地震勘探实例,介绍和分析了根据实地情况开发和应用的高分辨率地震震源激发技术,复杂地形、地质构造条件下共排列双向变偏移距高分辨率反射波多次覆盖技术,环保型地震反射波与折射波法野外同步施工技术。 Exemplified by the Xuefengshan Highway tunnel characterized by extraordinary length, large buried depth and complex mountain conditions, this paper has described and analyzed such technologies as the high-resolution seismic shooting technique, the high-resolution multifold coverage technique with common spread, bi-direction and variable offset for complex topography and geological structure, and the synchronous construction technique of seismic reflection and refraction for environmental protection. All these technologies have been developed and applied in practice according to field conditions.
出处 《物探与化探》 CAS CSCD 2007年第1期81-85,共5页 Geophysical and Geochemical Exploration
关键词 复杂地形 隧道 高分辨率地震 震源激发 双向变偏移距 同步施工 complex topography high-resolution seismic shooting bi-direction variable offset synchronous construction
  • 相关文献

参考文献1

共引文献11

同被引文献19

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部