期刊文献+

精益项目研发过程中的非增值活动分析 被引量:2

The Analysis on the Non-value-added Activities in Lean Product Development
原文传递
导出
摘要 本文对精益项目研发过程中的非增值活动进行了研究,建立了层次化的浪费金字塔模型,在对6种浪费要素分析的基础上,提出了项目研发过程浪费因果链,分析了产生10种浪费的原因及其具体表现形式。以卫星研发流程再造问题为例,采用解释结构模型法进一步分析了各种浪费之间的关系,并提出了其流程再造的基本途径。 The non-added-value actions in project development are studied. The pyramid model is established. Based on the analysis of six passive elements, the waste cause and effect chain in the process of project development is set up. The reason and behaves of ten kinds wastes are studied. For the problem of the satellite development business process reengineering, we constitute the relationship between various wastes using interpretative structural modeling and propose the approach of process reengineering.
出处 《工业工程与管理》 2007年第1期94-98,111,共6页 Industrial Engineering and Management
基金 国家自然科学基金委员会与中国民和航空总局联合资助项目(60672185)
关键词 精益方式 项目管理 价值管理 流程再造 解释结构模型 lean model product development value management business process reengineering interpretative structural modeling
  • 相关文献

参考文献6

  • 1Murman E. Lean Enterprise Value [M]. New York: Palgrave Press, 2002.
  • 2Christoph B. Lean Product Development: Making waste transparent[D]. Cambridge: Massachusetts Institute of Technology, 2004.
  • 3Morgan J M. High performance product development: A systems approach to a lean product development process [D].Michigan: University of Michigan, 2002.
  • 4SLACK R A. The application of lean principles to the military aerospace product development process [D]. Cambridge: Massachusetts Institute of Technology, 1998.
  • 5Womaek J, Jones D. The Machine that Changed the World[M]. New York: Simon & Schuster, 1990.
  • 6Strong Do , LEE Yang and Wang Richard. 10 Potholes in the Road to Information Quality,Computer, 1997, 30 (8) :38 - 46.

同被引文献3

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部