溪洛渡电站左岸地下厂房洞室群围岩稳定性研究 被引量:12

Study on the Cavern Surrounding Rock Stability of the Underground Powerhouse of the Xiluodu Hydropower Station
下载PDF
导出
摘要 利用预布大规模随机裂隙生成网格技术,采用非线性弹塑性有限元法,对溪洛渡左岸地下厂房洞室群加固前后进行了模拟,获得了洞周围压变形特征、应力分布状态,给出了洞周不稳定块体的部位及破坏形式及支护结构中的内力变化情况,通过对比、分析,得出一些结论,为溪洛渡左岸地下厂房洞室群的支护设计提供了科学依据和技术指导。 The grouped caverns of the left bank underground powerhouse of the Xiluodu hydropower project are modeled in detail by using the non - linear finite element method, taking into consideration joint distribution. The deformation, stress field and disturbed range of surrounding rock mass are studied and the difference between the unsupported cavern and the supported cavern is analysed. Moreover the location and the form of failure of the potential unstable block mass are demonstrated. The study results provide scientific basis and technical advice for support design of the left bank undergnamd powerhouse caverns of the Xiluodu hydropower project.
出处 《云南水力发电》 2007年第1期33-37,共5页 Yunnan Water Power
关键词 溪洛渡水电站 地下厂房 有限元 支护 破坏形式 Xiluodu hydropower station underground powerhouse finite element method support, failure form
  • 相关文献

参考文献4

二级参考文献6

  • 1卓家寿,非线性固体力学基础,1996年,65页
  • 2郑颍人 龚晓南.岩土塑性力学基础[M].北京:建筑工程出版社,1988..
  • 3HATZOR Y H,TALESNICK M,TSESARSKY M.Continuous and discontinuous stability of the bell-shaped caverns at Bet Gurvrin,Israel[J].International Journal of Rock Mechanics & Mining Sciences,2002,(39):867-886.
  • 4TALESNICK M L,HATZOR Y H ,TSESARSKY M.The elastic deformability and strength of a high porosity,anisotropic chalk[J].International Journal of Rock Mechanics & Mining Sciences,2001,(38):543-555.
  • 5SUN Jun-Lin,JIANG ming,JIA Gang.China's Longyou grottoes,Zhejiang province[J].News Journal International Society for Rock Mechanics,2001,6(3):44-46.
  • 6邓念元.二滩水电站泄洪洞进口边坡的变形稳定和加固[J].水电站设计,2001,17(1):24-28. 被引量:3

共引文献42

同被引文献91

引证文献12

二级引证文献72

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部