摘要
针对沈阳银河国际大厦变形缝处双排平行剪力墙支模的施工特点和难点,提出了变形缝处双排平行剪力墙支模的创新方案,即在后施工剪力墙外侧(靠变形缝一侧)支模采用定型可提升、可周转使用的大模板体系,运用一系列的创新构造技术,保证了施工质量、安全和工期目标。
This paper presented an innovative construction scheme of parallel double shear wall in deform joint of Yinhe International mansion, Shenyang.In the scheme, on the outside of late construction shear wall, near the deform joint, the support mould are large mould system that can be elevated and recycle used.The application of a series of innovative techniques ensured the construction quality, safety and time limit for the project.
出处
《工程质量》
2007年第2期23-26,共4页
Construction Quality
关键词
变形缝处平行双剪力墙
支模
创新
技术措施
parallel double shear wall in deform joint, support mould, innovation, technical measure