小浪底工程两岸坝肩山体渗漏特性分析

Permeability Characteristics Analysis of the Dam Abutment Mountain Mass on Both Banks of the Xiaolangdi Water Control Project
下载PDF
导出
摘要 小浪底大坝两岸坝肩山体存在透(含)水岩层和相对隔水岩层交替层状分布、倾向下游、断裂构造发育、上部风化卸荷严重等特点,水库蓄水后两岸坝肩山体呈现出层状渗漏、带状渗漏和壳状渗漏的特性,针对渗漏特性采取了防渗处理措施,取得了明显效果。 The dam abutment mountain mass on both banks of the Xiaolangdi Water Control Project is characterized by an alternate distribution of permeable layer,water-carrying layer and relative water barrier layer,dipping downstream,with fractured tectonic development and serious unloading via upper weathering.After impoundment of the reservoir,the dam abutment mountain mass on both banks has featured with the sandwich permeation,strip permeation and shell permeation.The anti-seepage treatment measures are applied according to the permeability features,resulting in an outstanding effect.
出处 《水利水电工程设计》 2007年第1期1-3,共3页 Design of Water Resources & Hydroelectric Engineering
关键词 坝肩山体 渗漏特性 防渗措施 小浪底工程 dam abutment mountain mass,permeability,anti-seepage measures,Xiaolangdi project.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部