摘要
上海轨道交通1号线开行大小交路列车,是根据客流预测和车辆配属的实际情况而采取的运营方案。阐述了开通大小交路后所采取的运营调整措施,包括运营列车调整措施,以及在车站和列车两方面所采取的客运组织措施。最后对1号线开行大小交路的运营实践经验进行总结。
On the basis the background of implementing the Long & Short Routing Operation Mode of Shanghai Metro Line 1, this paper discusses the necessity to running Long & Short Routing and the choice of turn-around stations, and ensures the operation schemes according to the passenger flow volume forecast and the quantities of allocation trains at the beginning of the extending section of Line 1. This paper expatiates on some active measures about adjustment, stations and trains for the passengers to understand the new operation mode. Lastly the paper summarizes some experiences about the Long & Short Routing operation practices of Line 1.
出处
《城市轨道交通研究》
2007年第1期50-53,共4页
Urban Mass Transit
关键词
城市轨道交通
大小交路
运行方案
urban rail transit, long & short routing, project of operation