摘要
介绍了抚顺石油化工公司热电厂66kV电力系统现状,对技术改造的方案及方案比较、短路电流计算,对SF6组合电器(GIS)、继电保护及计算机监控系统等先进设备优化设置进行了研究。
The 66 kV electric power system present condition of the Petrochemical Company of Fushun thermol electricity power plant is introduced. The projects comparison, short circuit current calculation, and the advanced equipments optimization setups such as composite apparatus of SF6 (GIS),relaying protection and supervisory computer control system are researched.
出处
《当代化工》
CAS
2007年第1期56-59,共4页
Contemporary Chemical Industry