针对中铝西南铝引进的(1+4)热连轧生产线安装调试问题,重点对该生产线主传动电机及主传动控制系统的方案选择进行介绍。
The selection of main driving motor and main driving control system for the line were introduced in dealing with the problems existed in the commissioning of 1 + 4 hot tandem rolling line imported by SWA.
出处
《铝加工》
CAS
2007年第1期43-46,共4页
Aluminium Fabrication
关键词
主电机
主传动
mair motor
main driving system