摘要
安钢烧结厂415m^2鼓风环冷机自2005年6月投产后出现了一些故障,通过认真分析和整改,目前这些问题已得到基本解决,设备作业率稳定在95%以上。
The 415m^2 forced draft circular cooler in ANGANG Sintering Plant was commissioned in June 2005. Some faults occurred since its commissioning were analyzed and were improved. Now, its operating rate has been increased above 95%.
出处
《烧结球团》
北大核心
2007年第1期42-44,共3页
Sintering and Pelletizing
关键词
鼓风环式冷却机
故障分析
改进措施
forced draft circular cooler, fault analysis, improvement