摘要
分析了富川县下湾水库主坝渗漏情况及其原因,论述了防渗加固设计的主要内容及措施,并提出了帷幕灌浆防渗加固设计的要点、施工技术及要求。通过对加固实施后1年来运行效果的检验,证明了加固设计施工的效果是良好的,并对岩溶地区修建和加固大坝提出了一些建议。
Based on an analysis of the main dam seepage status and causes of Xiawan reservoir in Fuehuan county, the author introduced the major contents and measures of anti-seepage reinforcement design, and presented the key design issues, construction technology and requirements of curtain grouting. Operation of one year since the reinforcement work was carried out has shown satisfactory effect. The author also gave some suggestions for construction and reinforcement of main dam in karst area.
出处
《广西水利水电》
2007年第1期40-43,共4页
Guangxi Water Resources & Hydropower Engineering