北京地铁4#线西单站施工方案比选 被引量:9

Preferred Construction Solution for Xidan Station Engineering on Line 4 # of Beijing Subway
下载PDF
导出
摘要 针对北京地铁4#线西单车站,提出盖挖顺作和盖挖逆作2种施工方案.分别给出这2种方案的围护结构设计参数和施工方法,分析了各自的优缺点;经过技术、经济、环境等方面的比较,选择了盖挖逆作方案,并给出了盖挖逆作施工工法.该车站选择盖挖逆作施工方法,施工造价略有增加,但降低了施工对环境的干扰,减少了对地面交通的影响,实践证明该方法安全可行. Alternative construction solutions, including cut-and-cover method and cover-and-cut reverse method, are proposed for Xidan station engineering on Line 4# of Beijing subway. Design parameters and construction methods for the retaining and support structures are given, respectively; and their advantages and disadvantages are analyzed. Cover-and-cut reverse method is selected as the preferred construction solution based on the comparison of technology, economy and environment. The construction method about the coverand-cut solution are erected Although the preferred solution costs a little more than the alternative one, the construction scheme will have little effects from surroundings and the influence to transportations on the ground surface will be reduced. It is verified through practice that the cover-and-cut reverse method is safe and feasible.
出处 《北京工业大学学报》 EI CAS CSCD 北大核心 2007年第2期160-165,共6页 Journal of Beijing University of Technology
基金 北京市教育委员会科学技术与研究生教育建设项目资助(4700001401506)
关键词 地铁车站 施工 地下结构 盖挖逆作法 subway stations construction underground structures cover-and-cut reverse construction .method
  • 相关文献

参考文献8

二级参考文献15

  • 1林航,赵滇生,曹亮.钢结构支撑在深基坑支护中的应用[J].山西建筑,2006,32(2):4-5. 被引量:6
  • 2谢世华,北京地铁建设,1994年,1期
  • 3孙长胜,地下工程与隧道,1994年,3期
  • 4团体著者,1993年
  • 5葛世平,地下工程与隧道,1993年,3期
  • 6葛世平,地下工程与隧道,1993年,4期
  • 7杜文库,中国土木工程学会隧道及地下工程学会第七届年会论文集
  • 8中交公路规划设计院.JTJ021-89公路桥涵设计通用规范[S].北京:人民交通出版社,2001.
  • 9建设部城市建设研究院.CJJ77-98城市桥梁设计荷载标准[S].北京:中国建筑工业出版社,1998.
  • 10中国铁道建筑总公司.六四式/加强型六四式军用梁铁路军用梁手册(增订版)[M].北京:中国铁道建筑总公司,1998.

共引文献209

同被引文献70

引证文献9

二级引证文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部