期刊文献+

基于时间耗费的城市轨道交通乘务排班优化 被引量:24

Optimization of Crew Scheduling for Urban Rail Transportation Based on Time Costs
下载PDF
导出
摘要 乘务排班问题一直是城市轨道交通运营部门面临的既关键又具体的问题之一,合理的排班对于减少运营中乘务费用支出,提高运营效益有着极其重要的意义。文中以上海城市轨道交通为背景,研究了城市轨道交通乘务排班软件中的优化方法。在以总时间耗费最小实现多目标优化的基础上,将优化过程分为两步,首先对列车运行线在乘务换乘点上划分为乘务作业段,这个过程归结为一个径路选择问题,通过最短路算法实现。然后将划分好的乘务作业段组合成乘务任务,这个过程是一个匹配问题,通过最小费用最大流算法来实现。本文对乘务作业段的定义与划分、时间耗费的计算及整个排班计算的实现过程进行了详细阐述。 Crew scheduling is one of the important and concrete problems facing the management of urban rail transportation. Reasonable crew scheduling is significant in reducing crew expenses and raising operation profits. This paper studies optimization of the crew scheduling software against the background of Shanghai urban rail transit. The optimizing course is decomposed into two stages on the basis of minimizing the total time cost and realizing multiple optimization objectives. First, cutting the runs into segments which are referred to as pieces, one segment assigned to one single driver. This stage is formulated as a pathing problem simplified with the shortest paths computations. Second, integrating the pieces to form duties. This stage is formulated as a matching problem solved by the min-cost max-flow algorithm. Defining and cutting of work-pieces, calculation of time costs and the process of total scheduling are detailed.
出处 《铁道学报》 EI CAS CSCD 北大核心 2007年第1期21-25,共5页 Journal of the China Railway Society
关键词 城市轨道交通 时间耗费 乘务作业段 最短路算法 最小费用最大流算法 urban rail transportation time costs crew work-piece shortest paths algorithm min-cost maxflow algorithm
  • 相关文献

参考文献6

  • 1Jean Yves Blais.The HASTUS Vehicle and Manpower Scheduling System at the S.T.C.U.M[J].Interface,1990,20(1):258-265.
  • 2Ball M.A Matching Based Heuristic for Scheduling Mass Transit Crew and Vehicles[J].Transportation Sci,1983,17(1):1427-1435.
  • 3Ketan Kotecha,Gopi Sanghani,Nilesh Gambhava.Genetic Algorithm for Airline Crew Scheduling Problem Using Cost-Based Uniform Crossover[J].Lecture Notes in Computer Science,2004,3285(2):84-96.
  • 4Peter Brucker,Sigrid Knust.Resource-constrained Project Scheduling and Timetabling[J].Lecture Notes in Computer Science,2001,2079(1):277-283.
  • 5Boschetti M A,Mingozzi A,Ricciardelli S.An Exact Algorithm for the Simplified Multiple Depot Crew Scheduling Problem[J].Annals of Operations Research,1998,1271(4):177-201.
  • 6Beasley J E,Cao B.Dynamic programming based algorithm of crew scheduling[J].Computers and Operations Research,1998,25(1):567-582.

同被引文献101

引证文献24

二级引证文献88

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部