摘要
介绍了坚持档案工作与建设工程的“五个同步”,牢牢抓住监理、施工、验收的“三个环节”,建立和推行以建设单位、监理单位、施工单位为“一体化管理”的工程档案计算机管理思路,从而强化工程项目档案的管理。
This paper introduces the experience of file managing as followings: keeping "5 synchronic" between file management and the construction, seizing "3 links" of supervising, construction and check and accept; Set.ins up and carrying out the method of "one -body management" by computer among the owner unit, supervising unit and the constructive unit, in this way strengthening the file management of the project
出处
《港口科技》
2007年第1期41-43,共3页
Port Science & Technology