东北电网抽水蓄能电站建设规模研究 被引量:4

Study on construction scale of pumped storage power plants in northeast China power grid
下载PDF
导出
摘要 分析东北电网目前调峰存在的主要问题。根据东北电网电源现状及负荷需求预测,通过电力平衡及调峰平衡分析,从技术可行性角度,提出东北电网2020年抽水蓄能电站的最小建设规模。通过优化分析,从经济性角度,提出抽水蓄能电站的经济建设规模。两方案的对比分析结果为合理规划东北电网抽水蓄能电站提供参考。 The main problems of peak regulation in northeast power gird were analyzed. Based on the current power installation and load forecasting, the minimal construction scale of pumped storage power plants (PSPP) in northeast power gird was proposed through power and peak balance analysis. Then the economical construction scale of PSPP was proposed through generation optimal analysis. Finally, the economical comparison of two PSPP construction plans provided valuable references for reasonable planning of PSPP in northeast power grid.
出处 《中国电力》 CSCD 北大核心 2007年第2期1-3,共3页 Electric Power
关键词 电源规划 东北电网 抽水蓄能电站 调峰 power planning northeast power grid pumped storage power plant (PSPP) peak regulation
  • 相关文献

参考文献3

二级参考文献9

共引文献15

同被引文献27

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部