摘要
该文介绍了上海轨道交通8号线陆家浜站北施工区地下连续墙施工过程中所存在的困难,论述了解决这些困难的方案的确定、采取的措施及取得的成效。
The article introduces the difficulties existing in the course of constructing the underground continuous wall in the north construction area of Liujiabang Station of Shanghai Rail Traffic No. 8 Line, and discusses the determined scheme, the used measures and achieved effect to solve these difficulties.
出处
《城市道桥与防洪》
2007年第3期61-66,共6页
Urban Roads Bridges & Flood Control
关键词
地下连续墙
暗浜处理
小幅施工
十字止水钢板接头
高导墙
电缆保护
underground continuous wall, treatment of covered river, small-range construction, cross-shaped water-stop steel plate joint, high guiding wall, cable protection