摘要
渠道过水断面水力简化计算方法,能较快获取渠底宽b及渠水深h值,可提高计算效率约12倍。
The calculation for discharging capacity of canal flow section can be simplified so that the width b of canal bed, the water depth h in the canal can be obtained quickly. The calculation efficiency would be 12 times increased more than that as usual.
出处
《云南水力发电》
1996年第4期57-59,共3页
Yunnan Water Power