万家寨引黄工程用泵泥沙磨损评估

Estimation on Silt Abrasion for Pumps in Wanjiazhai Water-Deversion Project
下载PDF
导出
摘要 针对万家寨引黄工程用泵的运行条件,用有限元方法计算了立式单吸单级泵轮内的流场,并以陕西东雷南乌牛二级站的H4型水泵磨损情况为例,对万家寨引黄工程总干线一、二级泵站和南干线一、二级泵站采用单级泵时的磨损情况进行了初步预估. According to the operating conditions of pumps of Wanjiazhai Water-Deversion Project, flow fields of vertical pumps of single suction and single-stage have been calculated with finite element method in this article. And with reference to the abrasion of H4 pump used in the Nanwuniu Station of Donglei Water-Deversion Project, a preliminary estimation of silt abrasion are made for pumps of the first and second station of the main line and the south line respectively.
出处 《水利水电技术》 CSCD 北大核心 1996年第12期15-21,共7页 Water Resources and Hydropower Engineering
关键词 水泵 泥沙 磨损预估 引黄工程 泵站 pump, silt, estimation of silt-abrasion, Wanjiazhai Water-Deversion Project