摘要 东北–华北联网后的计算分析表明,选择不同的发电机和负荷模型对稳定计算结果的影响较大,东北电网负荷模型的建模或校核需要以大扰动试验数据为依据,分析了实时动态监测系统(wide area measurement system,WAMS)在东北电网基于大扰动事件的负荷建模过程中的作用,WAMS是大扰动试验风险可观测、试验出现异常情况可控制的基本保障,为基于大扰动事件负荷建模研究提供了电网动态测试数据,其实测的相量数据同时也是建立仿真计算运行方式的重要数据源。运行经验表明,开展东北电网负荷建模的可持续研究需要基于WAMS的扰动数据收集、处理和分析制度的保障。 After the interconnection of Northeast Power Grid with North China Power Grid, both calculation and analysis show that the selection of different generator model and load model greatly influences the results of stability calculations, thus the modeling and verification of load models in Northeast Power Grid should be based on the data from large disturbances. The effect of wide area measurement system (WAMS) in large disturbance event based load modeling for Northeast Power Grid is analyzed. Analysis results show that WAMS is the basic ensure by which the risk in large disturbance experiment can be observed and the abnormal condition during the experiment can be controlled; it can provide dynamic measured data of the grid for the research on large disturbance event based load modeling, at the same time the measured data is also important data source for the simulation of operating modes. Operational experiences show that the ensure provided by disturbance data acquisition, processing and analysis system based on WAMS is necessary in order to implement sustainable research on load modeling for Northeast Power Grid.
出处 《电网技术》 EI CSCD 北大核心 2007年第5期45-49,共5页 Power System Technology
关键词 实时动态监测系统 大扰动试验 负荷建模 东北电网 电力系统 wide area measurement system large disturbance event load modeling northeast power grid power system
  • 相关文献

参考文献18

  • 1Price W,Ewart D,Gulachenski E,et al.Dynamic equivalents from on-line measurements[J].IEEE Trans on Power Apparatus and Systems,1975,94(4):1349-1357.
  • 2韩英铎,王仲鸿,林孔兴,杨永康,黄其励,蒋建民.电力系统中的三项前沿课题——柔性输电技术,智能控制,基于 GPS 的动态安全分析与监测系统[J].清华大学学报(自然科学版),1997,37(7):1-6. 被引量:71
  • 3Phadke A G.Synchronized phasor measurements in power systems[J].IEEE Computer Applications in Power,1993,6(2):10-15.
  • 4Burnett R O,Butts M M,Cease T W,et al.Synchronized phasor measurements of a power system event[J].IEEE Trans on Power Systems,1994,9(3):1643-1650.
  • 5高厚磊,江世芳,贺家李.利用卫星时间作基准的电力系统同步相量测量[J].电力系统及其自动化学报,1995,7(4):33-40. 被引量:17
  • 6Bhargava B.Synchronized phasor measurement system project at southern California edison co[C].IEEE Power Engineering Society Summer Meeting,Edmonton,Alta,1999,1:16-22.
  • 7Akke M,Karlsson D.Phasor measurement applications in Scandinavia[C].IEEE/PES Transmission and Distribution Conference and Exhibition,Asia Pacitic,2002,1:480-484.
  • 8Liu C W.Phasor measurement application in Taiwan[C].IEEE/PES Transmission and Distribution Conference and Exhibition,Asia Pacitic,2002,1:490-493.
  • 9Rasmussen J,Jorgensen P.Synchronized phasor measurements of a power system event in eastern Denmark[C].2003 Bologna IEEE Power Tech Conference Proceedings,Bologna,2003,3:678-682.
  • 10Saitoh H.GPS synchronized measurement applications in Japan[C].IEEE/PES Transmission and Distribution Conference and Exhibition,Asia Pacific,2003,1:494-499.

二级参考文献82

共引文献263

同被引文献59

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部