摘要
利用FLAC3D强大的前后处理功能来模拟某地铁车站工程风道结构的三种中板施工方案,并通过模拟计算,分别计算出三种中板方案施工后地表的沉降值,以此来评选三种中板施工方案的优劣。
This paper simulates three jobbing sheet construction schemes of air duct structure in a certain subway station project by using the strong pre-and post-processing functions of FLAC3D, and separately calculates the sedimentation value of ground after construction by the three schemes through analog calculation, in order to evaluate the quality of the three jobbing sheet construction schemes.
出处
《山西建筑》
2007年第1期271-272,共2页
Shanxi Architecture