基于冒天山越岭地段特殊的工程地质结构,对可研阶段的IVCK,C6K,CK,ICK等四个越岭方案进行了分析比选,并对初步设计阶段的地质选线进行了进一步的论述,以供其他类似工程参考借鉴。
On the basis of special engineering geologic structure in the section over Maotian mountain, the author analyzes and compares four over-mountain schemes as IVCK, C6K, CK and ICK, and further discusses geologic route selecting at primary design stage, which to offer a reference for other similar project.
出处
《山西建筑》
2007年第1期325-327,共3页
Shanxi Architecture
关键词
地质选线
地层结构
贯通方案