结合镇江电厂一期工程的地质概况,确定了水泥搅拌桩的施工工艺,研究了本复合地基桩间土的各项试验、单桩与复合地基的静载荷试验,并得出了相关结论,供类似工程参考应用。
Combined with geological conditions of the ftrst-stage enginering of Zhenjiang power plant oonstruction technology of cement mixing pile is determined. Experiments related to soil among pile and static test of single pile and composite foundation are made. Favorable conclusion is obtained, which provides good references for similar works.
出处
《山西建筑》
2007年第3期71-72,共2页
Shanxi Architecture
关键词
水泥搅拌桩
复合地基
静载荷试验
cement mixing pile, composite foundation, static load test