摘要
结合长桩钢筋笼的结构特点,介绍了钢筋笼制作场地的选择以及制作方法,阐述了钢筋笼的吊装沉放与连接技术,总结了钢筋笼吊装过程中的施工要点及措施,以确保钢筋笼入孔后不变形、位置准确。
Combined with the features of the reinforcement cage of long pile the selection for the production site and fabrication method are introduced as well as lifting, installation and connection technology. Practical key points are summarized for construction in order to ensure construction quality.
出处
《山西建筑》
2007年第3期81-82,共2页
Shanxi Architecture
关键词
钢筋笼
吊装
钢绞线
reinforcement cage, lifting, steel strand