摘要
比较了工程量清单与定额计价的区别,从工程量清单招投标、合同管理等方面论证了工程量清单计价应用在水文工程投资上的优越性,表明了工程量清单计价与市场相适应,适宜于水文工程计价及工程管理。
The differences between engineering bill pricing and fixed quota pricing axe comparatively analyzed. From tendering of engineering bill, contract management and other aspects advantages of the application of engineering bill pricing in hydrological engineering are discussed. Practice shows this pricing mode is suitable to hydrological engineering.
出处
《山西建筑》
2007年第3期233-234,共2页
Shanxi Architecture
关键词
工程量清单计价
定额计价
工程造价
合同管理
engineering bill pricing, fixed quota pricing, engineering cost, contract management