结合工程概况,对架梁前的准备工作进行了阐述,并对梁板运输与安装方面进行了介绍,论述了架桥机架梁过程中应注意的问题及其工艺流程,以供类似工程参考。
Combined with practical engineering, the author illustrates the preparatory work before erecting beam, introduces the transportation and installation of beam slab, and discusses the problems should be noticed in the process of erecting beam by bridge girder erection machine and its technological process, which to offer a reference for similar projects.
出处
《山西建筑》
2007年第3期317-318,共2页
Shanxi Architecture
关键词
桥梁梁板
架设方法
运输
安装
bridge beam slab, erection method, transportation, installation