摘要
结合工程概况,对方案的选择与设计进行了分析计算,并对静压桩托换加固进行了介绍,最后对静压桩中的一些技术问题的解决提出了建议与方法,观测表明,静压桩托换基础技术应用良好。
Combined with practical work, from seheme selection, design and analysis calculation the application of smile pile underpinning technique in strengthening dangerous buildings is introduced. According to technical questions existed resolving methods are proposed. Practical application of this technology receives good effect.
出处
《山西建筑》
2007年第2期123-124,共2页
Shanxi Architecture
关键词
静压桩
托换加固
框架结构
static pile, underpinning reinforcement, frame structure