摘要
水利工程施工围堰的修筑,关系到工程建设的安全,直接影响到主体工程的工期和工程项目的工程造价,从而影响到建筑企业的经济效益和社会效益。王曲泵站采用筑岛法施工,填筑15 m高的临时施工围堰,为水中填土修筑高围堰积累了经验。
The construction of coffer of hydraulic project relates to safety of project construction,directly influnces the construction period of main works and the cost of project,and therefore influnces the economic benefit of construction enterprise and society benefit.The temporary construction coffer of Wangqu Puming station,that stands 15 m high,is construted by means of the method of construting island.It accumulates experience to build high earth coffer by dumping soil into water.
出处
《山西水利科技》
2007年第1期50-53,共4页
Shanxi Hydrotechnics
关键词
泵站围堰
设计
施工
coffer of pumping station design construction