摘要
京南电站经过多年运行,通过多次大胆挖潜,取得了较好的效益。文章经过进一步分析,提出了再次挖掘潜力的设想。
Profits were obtained successively by daring to develop latent energy through long term operation in Jing-nan Power Plant. The paper provides, by further analysis, the assumption about additive development of latent energy.
出处
《广西电力》
2007年第1期18-19,26,共3页
Guangxi Electric Power
关键词
京南电站
挖掘潜能
提高效益
Jing-nan Power Plant
develop latent energy
upgrade profit