期刊文献+

基于全生命周期的R&D项目综合绩效评价系统模型研究 被引量:2

Research on Integrated Performance Elevation System Model of R&D Project Based on Total Life Cycle
下载PDF
导出
摘要 现有关于R&D项目综合绩效评价的研究大部分都是针对组织绩效展开的。在对国内外学者提出的综合绩效评价方法进行梳理的基础上,结合项目生命周期的3个阶段,提出了影响R&D项目绩效的8个关键因素,构建了基于R&D项目全生命周期的动态整体绩效评价系统模型,用于衡量整个生命周期中各个时间点的R&D绩效。 The studies about integrated performance elevation of R&D project mainly revolved on its organization. After combining those methods of integrated performance elevation proposed by scholars, this paper indentifies eight key factors affecting performance of R&D project in the total life cycle. Furthermore, the paper proposes an integrated performance elevation system model that can be used to elevate the overall performance at any point of time during life cycle.
出处 《科技进步与对策》 CSSCI 北大核心 2007年第2期109-112,共4页 Science & Technology Progress and Policy
关键词 R&D项目 全生命周期 绩效评价 R&D project total life cycle performance elevation
  • 相关文献

参考文献17

  • 1刘景江,郑刚,许庆瑞.国外R&D项目测度与评价研究述评[J].科研管理,2001,22(6):9-14. 被引量:14
  • 2Batson RG.Characteristics of R&D management which influence information needs[J].IEEE Tra nsactions on Engineering Management,1987,34,(3):78-83.
  • 3Foster RN,Linden LH,Whiteley RL,Kantrow AM.Improving the return on R&D-Ⅱ[J].Rsearch Technology Management,1985,March-April:13-22.
  • 4徐笑君,许庆瑞,陈劲.企业R&D绩效测量研究[J].科研管理,1998,19(4):37-40. 被引量:32
  • 5Brown & Svension.Measuring R&D productivity[J].Research Technology Management,1998,41,(6):30-35.
  • 6Kerssers-Ban Drongelen & Cook.Design principles for the developing of measurement systems for research and development processes[J].R&D Management,1997,27,(4):345-357.
  • 7Nixon.Research and development performance measurement:a case study.Management Accou nting Research[R].1998,(9):329-355.
  • 8Porter Jr.JG.Post audits-an aid to research planning[J].Research Management:28-30.
  • 9Krogh LC,Prager JH,Sorensen DP,TomlinsonJD.How 3M evaluates its R&D orograms[J].Research Technology Managemen,1998,NovemberDecember:10-13.
  • 10James W.Tipping,Eugene Zeffren and Alan R.Fusfeld.Assessing the Value of your technology[J].Research Technology Management,1995,38,(5).

二级参考文献30

  • 1官建成,屈交胜.试论R&D预研项目的中止决策[J].中外科技政策与管理,1995(10):33-36. 被引量:10
  • 2Lint,RD Management,1998年,28卷,4期,279页
  • 3Drongeken Kerssens-van,Bilderbeek.Performance measurement: more than choosing a set of metrics[J].R&D Managerment, 1999,29( 1 )
  • 4F.A.Schuman etal. Measuring. R&D Performance [J], Research Technology Management,5-6 1995.
  • 5Mottley C M, Newton R D. The selection of projects for industrial research[J]. Operation Research, 1959, 7:740-751.
  • 6Robert Schmidt, James R Freeland. Recent progress in modeling R&D project-selection progress[J]. IEEE Transactions on Engineering Management, 1992,39(2):1989-201.
  • 7Baker N R. R&D project selection model: an assessment[J]. IEEE Transactions on Engineering and Management, 1974,21(4):165-171.
  • 8Baker N R. R&D project selection model: an assessment[J]. IEEE Transactions on Engineering and Management, 1974,21(4):165-171.
  • 9Baker N R, Freeland J. Recent advances in R&D benefit measurement and project selection methods[J]. Management Science, 1975,21(10):1164-1175.
  • 10Moser Martin R. Measuring performance in R&D settings[J]. Research Management, 1985, 28(5):31-33.

共引文献90

同被引文献19

  • 1周国强,周伟.基于战略的平衡计分卡绩效评价系统构建[J].财会通讯(上),2006(10):72-73. 被引量:7
  • 2于秀艳.信息系统绩效动态评价的权重确定方法研究[J].情报杂志,2007,26(1):115-116. 被引量:6
  • 3Icmeli-Tukel, O. and Rom, W.O.. Analysis of the characteristics of projects in diverse industries. Journal of Operations Man- agement, 1998, (16):43-61.
  • 4Mark Winter, Tony Szczepanek. Projects and programmes as value creation processes: A new perspective and some practical implications. International Journal of Project Management, 2008,(26):95-103.
  • 5Harel Eilat, Boaz Golany, hvraham Shtub. R&Dproject evaluation: An integrated DEA and balanced scorecard approach. Omega, 2008, (35): 895- 912.
  • 6Stewart WE. Balanced scorecard for pro- jects. Project Management Journal, 2001,32 (1): 38- 53.
  • 7Rodney h. Stewart and Sherif Mohamed. Utilizing the balanced scorecard for IT/IS per- formance evaluation in construction. Construc- tion Innovation, 2001,(1):147-163.
  • 8Cooke-Davies, T.. The real success fac- tors on projects. International Journal of Project Management, 2002,20(3):185-190.
  • 9Collins, h., & Baccarini, D. Project success-h survey. Journal of Construction Re- search, 2004,5(2):211-231.
  • 10Bryde, D. J.. Methods for managing dif- ferent perspectives of project success. Brit-ish Journal of Management, 2005,16(2):119-131.

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部