摘要
在山区进行大吨位T梁施工时,T梁安装如何从侧向上墩,是T梁安装的关键技术。结合资阳沱江二桥T梁(30 m和40 m)以及国道318BT4德达特大桥T梁(30 m)的安装施工工艺,简要介绍提升T梁上桥2种方法(组合型钢长短柱上墩门架法和扒杆歪吊法)及其适用条件。
When constructing large weight T beam in mountainous areas, the essential technology in T- beam erection is how to lift up the T - Beam from pier side. Integrating with installation construction process for T beam (30 rn and 40 m) in Ziyang No. 2 Tuojiang Bridge and T - Beam (30 m) for Dedate Bridge on National Road 318 BT4, this paper gives a brief introduction to two T- beam lifting method (combined long and short support gantry crane method and standing derrick incline hoisting method) and application conditions.
出处
《公路交通技术》
2007年第1期100-104,共5页
Technology of Highway and Transport
关键词
大吨位预制T梁
侧向上墩
长短柱上墩门架
扒杆歪吊
large weight precast T- beam
pier side lifting
long and short support gantry crane
standing derrick incline hoisting