摘要
介绍了某工业厂房增层改造工程中,改造设计的理念,新旧结构地基沉降差异处理和改造施工中的一些关键技术措施。
Authors introduced something about a factory adding story and rebuilding construction, such as the design idea, differential settlement between new structure and old structure, and the key constructional measurements used in the project are also stated.
出处
《施工技术》
CAS
北大核心
2007年第2期85-88,共4页
Construction Technology
关键词
工业厂房
增层改造
设计理念
节点构造
差异沉降
adding story and rebuilding
design idea
joint constitution
differential settlement