摘要
蔡家冲(宜都)换流站是第1个噪声治理和主体工程同步进行的工程,经过运行检测,满足了工程要求,取得了较好的效果。在此工程中结合噪声分析研究的相关成果和工程的具体特点,采取了综合降噪措施,成果显著,可作为以后换流站噪声治理工作的参考。
Caijiachong (Yidu) Converter Station is the first project with noise control synchronized with the main project. After operational inspection it has met the engineering requirements with good results. In combination with noise analysis and related study results as well as concrete project features the station has adopted comprehensive noise reduction measures, which can be a reference for the future noise control at converter stations.
出处
《电力建设》
2007年第3期13-16,共4页
Electric Power Construction
关键词
换流站
噪声治理
换流变压器
电抗器
电容器组
converter station
noise control
converter transformer
reactor
, capacitor banks