摘要
深溪沟水电站装机容量660MW,年发电量32.03亿kW.h,是大渡河中游正建水库电站——瀑布沟下游的衔接梯级,该电站已通过国家发改委核准。电站建成后,除与瀑布沟电站联合运行,共同担任四川电力系统的调峰任务外,还担任瀑布沟电站调峰影响的反调节任务,其建设意义十分重要。
Shenxigou hydropower station is being built on the middle reach of the Dadu River , with installed capacity of 660MW and annual power generation of 3203 GWh and will be cascade power station downstream of Pubugou hydropower station. The project has been approved by the State Development and Reform Committee . The Shenxigou hydropower station will jointly operate with Pubougou hydropower station to regulate peak load in Sichuan power system , also will carry out re-regulation for Pubugou peak load regulation . Therefore , it is very significant to construct such a station.