摘要
根据大型循环流化床锅炉的设计、结构特点,以巡检司电厂为背景,从机械布置、施工方案、吊装顺序、衔接工序等方面阐述了此类锅炉的施工,力图确保安装质量,节约施工场地,缩短施工周期。
Based on the design and structure characteristics of large CFB boilers, this paper uses Xunjiansi Power Plant construction as an example to explain the construction of this type of boilers in machine arrangement, construction plan, hoist procedures, linking procedures, etc., in order to insure installation quality, reducing land occupation, and shorten the construction cycle.