期刊文献+

山东高炉炼铁生产技术“十一五”发展探讨

Development Discussion about Shandong Blast Furnace Iron-making Production Technology During the Eleventh-five Period
下载PDF
导出
摘要 介绍了“十五”山东炼铁生产技术概况,分析了存在的问题。山东炼铁面临的主要形势是资源节约和环境保护“。十一五”炼铁工作重点是,淘汰落后发展大型高炉,节能降耗,技术创新重点围绕降低能源、资源消耗开展工作。 The general situations of Shandong iron-making production technology in the tenth-five period are introduced and existent problems are analyzed. The main position that Shandong iron-making is confronted with is saving resources and protecting environment. The important work of iron-making during the Eleventh-five Year Plan is to cancel small furnaces and develop high capacity furnaces, to save energy and less consumption, the key work of technology innovation is to reduce energy and resource consuming.
出处 《山东冶金》 CAS 2007年第1期9-11,共3页 Shandong Metallurgy
关键词 炼铁 生产技术 发展探讨 iron-making production technology development discussion
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部